How many paving slabs per square metre?
It depends on slab size. 600mm by 600mm slabs give about 2.8 per square metre, 450mm by 450mm give about 4.9, and 300mm by 300mm give about 11. Add a little for cuts.
The count comes straight from the slab size. A 600mm by 600mm slab covers 0.36 of a square metre, so you need about 2.8 per square metre. A 450mm by 450mm slab needs roughly 4.9, and a 300mm by 300mm slab needs about 11.
For a full patio, divide the area by the coverage of one slab and add around 5 to 10 percent for cuts, breakages and the odd awkward edge.
Otis takes the patio dimensions and the chosen slab size, works out the pack quantity with waste, checks stock and prices the slabs, sub base and jointing together for the account.
Worked example
A 15 square metre patio in 600 by 600mm slabs needs about 42 slabs. Add 5 to 10 percent for cuts around edges and steps, so order 44 to 46.
Before you order
- Allow for joint width when planning, as 10mm joints change how many slabs fit a fixed space.
- Order all slabs from one batch, as natural stone and coloured concrete vary between batches.
- Lay on a full mortar bed rather than spots of mortar, which leave voids under the slab.
General guidance for the trade. Always follow current Building Regulations, manufacturer instructions and the specifics of the job.

See what Otis would capture for you
Book a strategic call and we will model it against your own numbers.