If Otis does not lift your conversion in 90 days, you get your money back.Take the free 60 second audit

Trade knowledge

What fall should a patio have?

A patio should slope away from the building to drain, at a fall of around 1 in 80. That is roughly a 12mm drop per metre, so a 3 metre patio falls about 40mm across its width.

To shed rainwater and stop pooling, a patio should fall away from the house at around 1 in 80, which is about 12mm of drop for every metre. Over a three metre patio that gives roughly a 40mm fall from the wall to the outer edge.

Keep the finished paving at least 150mm below the damp proof course, and direct water towards a drainage channel or a suitable soakaway rather than towards the building.

Otis helps a customer plan the paving, sub base and any drainage channel, checks stock and prices the materials for the account.

General guidance for the trade. Always follow current Building Regulations, manufacturer instructions and the specifics of the job.

See what Otis would capture for you

Book a strategic call and we will model it against your own numbers.

Need a hand? Ask me anything about OptiFlow.
O

Otis

AI assistant · Online now
Powered by OptiFlow
90Day Guarantee

The 90 Day Money Back Guarantee

If Otis does not lift your conversion in 90 days, you get your money back.

Measured against your website conversion rate in the 30 days before Otis goes live. If it is not higher after 90 days, we refund the Otis fees for that period. Applies to the initial term and the metric agreed at sign up.

Take the free 60 second audit