How much ballast and cement per cubic metre of concrete?

For a general 1 to 5 mix, one cubic metre of concrete takes roughly 2 tonnes of all in ballast and about 6 to 8 bags of 25kg cement. Stronger mixes use more cement.

Working from a common 1 part cement to 5 parts ballast mix, a cubic metre of finished concrete needs roughly 1.8 to 2 tonnes of all in ballast and around 6 to 8 bags of 25kg cement, allowing for the materials packing down.

A stronger mix, such as 1 to 4, uses more cement for the same ballast, while foundations may use a leaner mix. Always match the mix to the job.

Otis converts a slab or footing into cubic metres, works out the ballast and cement for the chosen mix, checks stock and prices it for the account.

General guidance for the trade. Always follow current Building Regulations, manufacturer instructions and the specifics of the job.

See what Otis would capture for you

Book a strategic call and we will model it against your own numbers.

Need a hand? Ask me anything about OptiFlow.
O

Otis

AI assistant · Online now
Powered by OptiFlow
90Day Guarantee

The 90 Day Money Back Guarantee

If Otis does not lift your conversion in 90 days, you get your money back.

Measured against your website conversion rate in the 30 days before Otis goes live. If it is not higher after 90 days, we refund the Otis fees for that period. Applies to the initial term and the metric agreed at sign up.

Take the free 60 second audit