How much sand for block paving?
Block paving uses a laying course of sharp sand around 50mm deep, roughly 0.05 cubic metres per square metre, plus kiln dried sand brushed into the joints once laid.
Block paving is laid on a screeded bed of sharp sand about 50mm thick over a compacted sub base. That works out at roughly 0.05 cubic metres, or around 75 to 90kg, of sharp sand per square metre.
Once the blocks are down and compacted, kiln dried sand is brushed into the joints to lock them together, so allow for that separately. The sub base sits below the sand bed and carries the load.
Otis converts the area into sharp sand, kiln dried sand and sub base, along with the blocks and any edging, and prices it all for the account.
Worked example
A 20 square metre driveway with a 50mm laying course needs about 1 cubic metre of sharp sand, roughly 1.5 to 1.8 tonnes. On top of that comes kiln dried sand for the joints, brushed in once the blocks are laid and compacted.
Before you order
- Use sharp sand for the laying course, not soft building sand, which moves under load.
- Keep the sand covered so it stays evenly damp, as wet and dry patches screed to different levels.
- Order kiln dried sand separately, as it must be completely dry to run into the joints.
General guidance for the trade. Always follow current Building Regulations, manufacturer instructions and the specifics of the job.