How much ballast and cement per cubic metre of concrete?
For a general 1 to 5 mix, one cubic metre of concrete takes roughly 2 tonnes of all in ballast and about 6 to 8 bags of 25kg cement. Stronger mixes use more cement.
Working from a common 1 part cement to 5 parts ballast mix, a cubic metre of finished concrete needs roughly 1.8 to 2 tonnes of all in ballast and around 6 to 8 bags of 25kg cement, allowing for the materials packing down.
A stronger mix, such as 1 to 4, uses more cement for the same ballast, while foundations may use a leaner mix. Always match the mix to the job.
Otis converts a slab or footing into cubic metres, works out the ballast and cement for the chosen mix, checks stock and prices it for the account.
Worked example
A garage base 3 by 6 metres at 100mm deep is 1.8 cubic metres of concrete, which takes roughly 3.3 to 3.6 tonnes of all in ballast at 1.8 to 2 tonnes per cubic metre.
Before you order
- For more than about a cubic metre, ready mixed concrete is often quicker and more consistent than mixing on site.
- Keep cement dry and use it before the date on the bag.
- Measure every batch the same way, such as by the bucket, so the mix stays the same strength.
General guidance for the trade. Always follow current Building Regulations, manufacturer instructions and the specifics of the job.