Otis calculator

Timber calculator

Work out how many lengths of timber to buy, the linear metres and the volume in cubic metres, for studwork, joists, battens or boards.

Work out your timber

Enter the section size, the length you will buy and the total run of timber you need.

0

lengths to buy

Linear metres bought0
Total volume0
Volume of one length0

Otis works out the timber, fixings and sheet materials for a whole job and prices them together, on your live stock.

Volume is thickness times width times length for each piece, in metres. Timber is commonly sold from 1.8m to 6m in 300mm steps, but stock varies, so check what your merchant carries. An estimate, always confirm with your merchant.

A 4 m by 3 m kitchen floor plan turned into a tiling materials list
Measurements in, materials out: the same sums Otis works out for your customers.

How the numbers work

Add your wastage to the linear metres you need, divide by the length of each piece and round up to whole lengths. Volume is each piece’s thickness times width times length in metres, times the number of pieces, which is how timber is often priced in bulk.

To work out the run, count the pieces first. Studs at 400mm centres on a 3.6m wall need 10 studs, then add extra for openings, corners and noggins. Joists work the same way across the span.

This is what Otis does, instantly

A calculator like this works out quantities. Otis goes further. It takes a customer question, works out the materials, checks live stock and pricing in the merchant’s own system, builds the quote and takes the order, day or night. What takes a builder a few minutes here happens in seconds on a merchant’s website and trade counter.

Common questions

How do I convert linear metres to cubic metres?

Multiply the linear metres by the thickness and the width in metres. 100 linear metres of 47 by 100mm timber is 100 × 0.047 × 0.1, which is 0.47 cubic metres.

What lengths does timber come in?

Usually 1.8m to 6m in 300mm steps, though what is in stock varies by merchant and by type of timber.

How much wastage should I allow for timber?

About 10 percent covers offcuts on most jobs. Allow more where there is a lot of angled cutting.

How many studs do I need for a stud wall?

Divide the wall length by the stud spacing, usually 400 or 600mm, and add one. Then add studs for openings and corners, plus noggins.

More trade calculators

Get this result by email

Pop in your email and we will send this over with a handy checklist. No spam, opt out any time.

See Otis price a whole job

Otis works out every material a job needs and quotes it together, on your live pricing.

Book an Otis demo
Need a hand? Ask me anything about OptiFlow.
O

Otis

AI assistant · Online now
Powered by OptiFlow
90Day Guarantee

The 90 Day Money Back Guarantee

If Otis does not lift your conversion in 90 days, you get your money back.

Measured against your website conversion rate in the 30 days before Otis goes live. If it is not higher after 90 days, we refund the Otis fees for that period. Applies to the initial term and the metric agreed at sign up.

Take the free 60 second audit