Otis calculator

Mortar calculator

Work out the mortar, cement and sand for brickwork, blockwork or a patio bed, with the number of bricks or blocks to match.

Work out your mortar

Choose the job, enter the area and pick a mix. For a patio, set the depth of the mortar bed.

0

25kg bags of cement

Sand0
Wet mortar volume0
Bricks or blocks0

Otis works out the bricks, blocks, sand and cement for a whole wall and prices them together, on your live stock.

Assumes about 0.03 cubic metres of wet mortar a square metre for a half brick wall, 0.06 for a one brick wall and 0.01 for 100mm blockwork, all with wastage, and a patio bed at your depth plus 10 percent. Adds a third to the volume for the dry materials, because mortar shrinks when water is added. 60 bricks or 10 blocks a square metre. Cement at 1440kg and sand at 1600kg a cubic metre. An estimate, always confirm with your merchant.

A 4 m by 3 m kitchen floor plan turned into a tiling materials list
Measurements in, materials out: the same sums Otis works out for your customers.

How the numbers work

The calculator works out the wet mortar for your area, then adds a third to get the volume of dry sand and cement, because the mix loses volume once water goes in. It splits that by your mix, so a 1 to 5 mix is one part cement to five parts sand.

For brickwork it assumes standard 215 by 102.5 by 65mm bricks with 10mm joints, which is 60 bricks a square metre of half brick wall. Blockwork assumes 440 by 215mm blocks, 10 a square metre. That works out at roughly 0.9 tonnes of building sand and 6 to 7 bags of cement for every 1,000 bricks at 1 to 5, in line with the usual rule of thumb of about a tonne of sand per 1,000 bricks.

This is what Otis does, instantly

A calculator like this works out quantities. Otis goes further. It takes a customer question, works out the materials, checks live stock and pricing in the merchant’s own system, builds the quote and takes the order, day or night. What takes a builder a few minutes here happens in seconds on a merchant’s website and trade counter.

Common questions

What mortar mix should I use?

1 to 5 cement to sand suits most general brickwork. Use 1 to 4 for exposed walls or work below the damp proof course, and 1 to 6 for soft or older bricks. Patios are usually bedded on a stronger sharp sand and cement mix.

How much mortar do I need for 1,000 bricks?

About half a cubic metre of wet mortar for a half brick wall. At 1 to 5 that is roughly 0.9 tonnes of building sand and 6 to 7 bags of cement.

How many bricks are there in a square metre?

60 for a half brick wall using standard 215 by 65mm bricks with 10mm joints, and 120 for a one brick wall.

Building sand or sharp sand?

Building sand, also called soft sand, for bricklaying mortar. Sharp sand for patio bedding, screeds and concrete.

More trade calculators

Get this result by email

Pop in your email and we will send this over with a handy checklist. No spam, opt out any time.

See Otis price a whole job

Otis works out every material a job needs and quotes it together, on your live pricing.

Book an Otis demo
Need a hand? Ask me anything about OptiFlow.
O

Otis

AI assistant · Online now
Powered by OptiFlow
90Day Guarantee

The 90 Day Money Back Guarantee

If Otis does not lift your conversion in 90 days, you get your money back.

Measured against your website conversion rate in the 30 days before Otis goes live. If it is not higher after 90 days, we refund the Otis fees for that period. Applies to the initial term and the metric agreed at sign up.

Take the free 60 second audit