How much MOT Type 1 do I need per square metre?
MOT Type 1 has a compacted density of roughly 2 tonnes per cubic metre. At 100mm depth that is about 0.2 tonnes, or 200kg, per square metre.
To work out Type 1, multiply area by depth to get cubic metres, then multiply by about 2 to get tonnes, since compacted Type 1 sits around 2 tonnes per cubic metre. So 10 square metres at 100mm deep is 1 cubic metre, roughly 2 tonnes.
Otis does this instantly from the area and depth, converts to tonnes or bulk bags, checks availability and prices the load for the account.
Worked example
A 20 square metre patio base at 100mm deep is 2 cubic metres once compacted, so about 4 tonnes of MOT Type 1. Order around 10 percent extra to allow for levels and a firm finish.
Before you order
- Allow around 100mm for patios and paths and 150mm for driveways.
- Compact in layers with a plate compactor, dampening the stone slightly if it is very dry.
- For larger jobs a loose tipper load can work out cheaper than bulk bags.
General guidance for the trade. Always follow current Building Regulations, manufacturer instructions and the specifics of the job.