Work out your concrete mix

Enter the size of the slab or base and choose a mix ratio.

0

25kg bags of cement

Concrete volume0
Sharp sand0
20mm gravel0
Or all in ballast0
Ready mix to order0

Otis works out the cement, aggregates and sub base for a whole base and prices them together, on your live stock.

Uses a dry volume 1.54 times the wet volume, cement at 1440kg, sharp sand at 1600kg and 20mm gravel at 1680kg a cubic metre, the same figures as our concrete calculator. Ballast is the sand and gravel together. Ready mix adds 5 percent and rounds up to the nearest quarter of a cubic metre. An estimate, always confirm with your merchant.

A 4 m by 3 m kitchen floor plan turned into a tiling materials list
Measurements in, materials out: the same sums Otis works out for your customers.

How the numbers work

The calculator multiplies length by width by depth to get the wet volume of concrete. Dry materials take up more room than the finished concrete, so it multiplies by 1.54 and splits that dry volume by your ratio. In a 1:2:4 mix that is one part cement, two parts sharp sand and four parts gravel.

Cement is shown in 25kg bags and the aggregates in tonnes, the units most merchants sell. If you would rather buy all in ballast, which is sand and gravel premixed, use the ballast figure instead of the two separate ones.

This is what Otis does, instantly

A calculator like this works out quantities. Otis goes further. It takes a customer question, works out the materials, checks live stock and pricing in the merchant’s own system, builds the quote and takes the order, day or night. What takes a builder a few minutes here happens in seconds on a merchant’s website and trade counter.

Common questions

What is a 1:2:4 concrete mix?

One part cement, two parts sharp sand and four parts gravel, measured by volume. It is the usual mix for bases, paths and footings.

What mix should I use for a shed base?

Most garden shed bases use a 1:2:4 mix about 75 to 100mm thick, laid on a layer of compacted hardcore or MOT Type 1.

Should I use ballast or separate sand and gravel?

All in ballast is sand and gravel already mixed, usually used at one part cement to five or six parts ballast. Buying sand and gravel separately lets you set an exact ratio.

When is ready mix better than mixing by hand?

For larger slabs, often above about a cubic metre, ready mix is quicker and more consistent. Order a little extra, because running short in the middle of a pour is worse than a small surplus.

More trade calculators

Get this result by email

Pop in your email and we will send this over with a handy checklist. No spam, opt out any time.

See Otis price a whole job

Otis works out every material a job needs and quotes it together, on your live pricing.

Book an Otis demo
Need a hand? Ask me anything about OptiFlow.
O

Otis

AI assistant · Online now
Powered by OptiFlow
90Day Guarantee

The 90 Day Money Back Guarantee

If Otis does not lift your conversion in 90 days, you get your money back.

Measured against your website conversion rate in the 30 days before Otis goes live. If it is not higher after 90 days, we refund the Otis fees for that period. Applies to the initial term and the metric agreed at sign up.

Take the free 60 second audit