If Otis does not lift your conversion in 90 days, you get your money back.Take the free 60 second audit
Otis calculator

Screed calculator

Work out the sand and cement you need to screed a floor. Enter the area and thickness and get the materials.

Work out your screed

Enter the floor area and the screed thickness.

0

25kg bags of cement

Screed volume0 m³
Sharp sand0 kg
Sand in tonnes0 t

Otis pulls the sand and cement for the whole floor and prices it on your live stock.

Assumes a 1 to 4 cement to sharp sand screed mix, with densities of 1440kg per cubic metre for cement and 1600kg for sand. An estimate, always confirm with your merchant.

How the numbers work

The calculator works out the screed volume from the floor area and thickness, then splits it into cement and sharp sand for a standard 1 to 4 floor screed. A common thickness for a sand and cement screed is 50 to 75mm.

Cement is shown as 25kg bags and sand as kilograms and tonnes so you can order in the units your merchant sells.

This is what Otis does, instantly

A calculator works out quantities. Otis takes a customer question, works out the materials, checks live stock and pricing, builds the quote and takes the order, day or night.

Common questions

What mix is used for floor screed?

A traditional sand and cement screed is usually mixed at 1 part cement to 3 or 4 parts sharp sand. This tool uses 1 to 4.

How thick should a screed be?

A bonded sand and cement screed is often 40 to 50mm, unbonded or floating screeds thicker. Check your floor build up.

How much sand and cement for a screed?

It depends on area and thickness. A 40 square metre floor at 50mm needs roughly two cubic metres of screed, which this tool breaks into bags and tonnes.

Does this include wastage?

A small allowance is built into the volume. Order a little spare for the mix and for finishing.

More trade calculators

Get this result by email

Pop in your email and we will send this over with a handy checklist. No spam, opt out any time.

See Otis quote the whole floor

Screed, insulation and membrane together, priced on your live stock in seconds.

undefined

Need a hand? Ask me anything about OptiFlow.
O

Otis

AI assistant · Online now
Powered by OptiFlow
90Day Guarantee

The 90 Day Money Back Guarantee

If Otis does not lift your conversion in 90 days, you get your money back.

Measured against your website conversion rate in the 30 days before Otis goes live. If it is not higher after 90 days, we refund the Otis fees for that period. Applies to the initial term and the metric agreed at sign up.

Take the free 60 second audit